Practical business valuation

Replenishment date: 06.05.2015
Content: 50506084458017.rar (31.67 KB)
️Automatic issue of goods ✔️
Sales:
2
Refunds:
0
Reviews:
0
Views:
170
Seller
Seller:
alevtina_sar
Rating:
3,21
Ask a Question
Report a violation
Description
Task 1.

A detached administrative three-storey brick building located in the South District is being evaluated. To analyze the comparative sales, an analogue was identified - a three-storey detached brick building located in the Sever District. The analogue was sold for $ 1.700.000. The database contains the following pairs of comparable objects:

Object number

Location, district

Physical characteristics and purpose of the object

Price, USD

1

"South"

One-story block office building

950.000

2

"North"

Also

800.000

3

"South"

Two-story brick building for a shop

1.250.000

4

"North"

Also

900.000

Determine the cost of the appraised object, taking into account the correction for location.



Task 2.

A two-storey building with an attached hall is being evaluated. There is a similar building, but without a hall, sold for $ 120.000. In addition, there is data on the following analogue objects:

Object

Hall presence

Physical characteristics and purpose of the object

Price, USD

1

present

Three-storey block building

122.000

2

no

Also

115.000

Determine the cost of the object, taking into account the improvements.
Additional Information
Task 3.

A two-storey office building with an area of ​​1.000 sq. m., requiring cosmetic repairs. There is an analogue - a two-story office building with an area of ​​1.350 sq. m., which has been overhauled. The analog was sold for $ 2.250.000. The following data on pair sales is also available:

Object

Physical characteristics and purpose of the object

Object state

Price, USD

1

one-story brick office building, = 750 sq. m.

Repair required

800.000

2

one-story brick office building, = 600 sq. m.

Repairs carried out

1.600.000

Determine the price of the object, taking into account the correction for repairs.



Task 4.

The administrative building is estimated with 15% wear and tear. The following data are available for recently sold properties:

Object

Wear percentage

Price, USD

1

20

75400

2

85

30680

3

35

66600


Determine the likely price of the office building, adjusted for depreciation.



Task 5.

It is necessary to evaluate the property with LDPE at $ 15.000. The databank contains the following information about recently sold analogues:



Analogue

Sale price, Ca

LDPE

BPM

A

90.000

16.000



B

105.000

17.500



C

75.000

13.500





Task 6.

Estimate the cost of a brick production line using a cost approach if the following data were obtained during the assessment process:

total equipment depreciation is 30%;
the price of a similar line is 2 million rubles.
productivity of the evaluated line - 2000 units / shift;
analogue productivity - 1500 units / shift;
average market profitability of similar equipment - 27%
VAT - 18%
Income tax rate is 20%.
Similar items
Business valuation
Seller:
alevtina_sar
Rating:
3,21
Sales:
0
price:
3,27 $
Business value assessment test
Seller:
alevtina_sar
Rating:
3,21
Sales:
1
price:
0,87 $
Business value assessment Synergy test ready
Seller:
alevtina_sar
Rating:
3,21
Sales:
45
price:
1,63 $