DIPLOMA Business process management based on IDEF0
Replenishment date: 16.09.2008
Content: 80916212826623.rar (149.57 KB)
️Automatic issue of goods ✔️
️Automatic issue of goods ✔️
Sales:
1
Refunds:
1
Reviews:
0
Views:
750
Description
3 introduction
1. Special part of the project 6
1.1. Development of TK, TT, TU 6
1.1.1. Terms of reference (in accordance with GOST 34.602-86) 6
1.1.2. Technical requirements (in accordance with GOST 2.114-70, section 2.5) 10
1.1.3. Technical operating conditions (in accordance with GOST 2.114-70) 14
1.2 Development of structural and functional schemes of the system 16
1.3. Basis for choosing a database. 18
1.4. Development of instructions for using the system 19
1.5. Calculation of technical indicators: performance and reliability 23
1.6. Life cycle calculation 25
1.7. Compliance Test 36
1.8. Quality model 41
1.9. Providing life cycle 48
1.10. Protection model. Protecting 53
1.11. Project management 60
1.12. Justification and selection of hardware platform and software environment 66
2. Task on the economic part 68
2.1. Business plan for project 68
2.2. Calculation of costs and contract prices 71
2.3. Assessment of the economic feasibility of the project 74
3. Ecology 76
3.1. Determination of optimal working conditions for software engineer 76
3.2. Optimal programmer workplace 78
3.3 Optimal programmer workload 81
3.4. Ventilation calculation 83
Conclusion 85
References 87
1. Special part of the project 6
1.1. Development of TK, TT, TU 6
1.1.1. Terms of reference (in accordance with GOST 34.602-86) 6
1.1.2. Technical requirements (in accordance with GOST 2.114-70, section 2.5) 10
1.1.3. Technical operating conditions (in accordance with GOST 2.114-70) 14
1.2 Development of structural and functional schemes of the system 16
1.3. Basis for choosing a database. 18
1.4. Development of instructions for using the system 19
1.5. Calculation of technical indicators: performance and reliability 23
1.6. Life cycle calculation 25
1.7. Compliance Test 36
1.8. Quality model 41
1.9. Providing life cycle 48
1.10. Protection model. Protecting 53
1.11. Project management 60
1.12. Justification and selection of hardware platform and software environment 66
2. Task on the economic part 68
2.1. Business plan for project 68
2.2. Calculation of costs and contract prices 71
2.3. Assessment of the economic feasibility of the project 74
3. Ecology 76
3.1. Determination of optimal working conditions for software engineer 76
3.2. Optimal programmer workplace 78
3.3 Optimal programmer workload 81
3.4. Ventilation calculation 83
Conclusion 85
References 87